Payback formula
upgrade cost ÷ (after-upgrade hourly rate − current hourly rate)A positive difference gives an estimated payback time. No increase is reported neutrally; a lower modeled rate is not converted into a false payback result.
Enter an upgrade cost and two comparable hourly income rates. The calculator divides the cost by the increase in modeled hourly income; it never invents treadmill, pen, or boost effects.
Use the same unit, conditions, and gross or net basis for both rates. Treadmill speed is never converted into egg income automatically.
upgrade cost ÷ (after-upgrade hourly rate − current hourly rate)A positive difference gives an estimated payback time. No increase is reported neutrally; a lower modeled rate is not converted into a false payback result.
Use rates measured or calculated under matching assumptions: the same price basis, boosts, costs, duration, and production conditions. If those conditions differ, the result is not a clean upgrade comparison.